Transit
|
THOUGHTFUL, FOCUSED, AND BOLD
ELEVATING THE TRANSPORTATION EXPERIENCE |
Chicago Southwest Transit 35th & Archer Station
Chicago - IL New construction of a 12,000sf CTA station, at the intersection of 35th street and Archer Ave., on the southwest transit line system connecting Chicago’s loop to Midway Airport. The design accommodates a bus terminal and a kiss & ride area, Architectural concrete intermixed with glazed tile and a suspended curved metal acoustical ceiling. Area: 11,700 SF Completed: 1992 Cost: $17 million Owner: City of Chicago |
|